Every job below is one we do ourselves across Wauwatosa.
We build new decks on footings poured below Wisconsin's 42-inch frost line, so the structure doesn't heave when the ground freezes and thaws. Framing is 2x8 or 2x10 pressure-treated joists on 16-inch centers, sized to the span and the load you actually want on it, hot tub or not. We handle the permit and the inspection calls that come with it.
Some yards want a simple rectangle off the slider, others need a deck that steps down around a grade change or wraps a tree. We draw the layout before any lumber is ordered, so you can see the stair location and railing run ahead of time. If the slope or soil changes the footing plan, you'll hear about it before it changes the price.
Soft boards, sagging joists, and railings that move when you lean on them make up the bulk of our repair calls. We pull the bad boards and check the joist underneath before replacing anything, since a new board over a rotten joist doesn't fix much. Most repairs get done in a day or two, not a full rebuild.
A deck left unsealed for a few summers starts graying and splintering, and pressure-treated lumber wants a reseal roughly every two to three years to keep water out. We strip the old finish, let the wood dry, sand it, and apply a penetrating stain rather than a film coat that peels. Cedar and pressure-treated take stain differently, so we match the product to the wood.
Composite boards like Trex or TimberTech skip the staining and won't splinter, but they call for hidden fastener systems and proper gapping for thermal expansion, which is where a lot of DIY composite decks go wrong. We install to the manufacturer's span tables so the warranty actually holds. It costs more up front than pressure-treated, less over ten years.
Sometimes the frame underneath is still solid and it's just the decking boards that are shot. We'll replace boards one at a time or resurface the whole deck, matching the original board spacing so the new boards don't stand out. Good option when the structure was built right the first time and the boards just wore out.
A wobbly railing is usually a loose post connection, not a railing problem, so we check the post-to-rim-joist bolt before replacing any balusters. New railings get built to current code, no gap wider than four inches between balusters. We'll match an existing style or swap it for cable or metal if you want a cleaner look.
Tearing out an old deck means dealing with buried fasteners, old concrete piers, and sometimes a ledger bolted through rotten rim joist for years. We haul away the lumber and sweep the site for screws and nails before we leave. Demolition is usually priced separate from the new build, since what's underneath isn't fully known until we open it up.
Turning an open deck into a screened porch changes the framing, the roof tie-in, and sometimes the footing load, so it's a bigger job than it looks from the outside. We'll tell you up front if the existing deck frame can carry a roof, or if that part needs rebuilding first. Not every deck can become a porch without touching the structure underneath.
If an inspector flags a deck or you just don't trust how it feels underfoot, we check ledger attachment, joist hangers, and footing depth before touching the surface boards. A lot of older decks around here were built with nailed joist hangers instead of structural screws, which loosens over time. We rebuild the framing to current code even when the decking on top stays the same.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
A few decks we've built and fixed recently.


Deck work travels well within about fifty miles of Wauwatosa.
Questions that come up once a deck project is underway.
Describe the problem and we will tell you what it probably is. No obligation.